• Liquid Beverage Juice Filling Bottling Machine
  • Liquid Beverage Juice Filling Bottling Machine
  • Liquid Beverage Juice Filling Bottling Machine
  • Liquid Beverage Juice Filling Bottling Machine
  • Liquid Beverage Juice Filling Bottling Machine
  • Liquid Beverage Juice Filling Bottling Machine

Liquid Beverage Juice Filling Bottling Machine

Type: Volumetric Filling Machine
Automatic Grade: Automatic
Material Type: Liquid
Filling Valve Head: Multi-Head
Feed Cylinder Structure: Multi-Room Feeding
Dosing Device: Surface Type
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2011

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (19)
  • Overview
  • Product Description
  • About Sunswell
Overview

Basic Info.

Model NO.
RXGF
Filling Principle
Atmospheric Pressure
Packaging Container Lifting Structure
Chute Lifting
Structure
Rotary
Packaging
Bottle
Packaging Material
Plastic
Application
Juice Beverage
Driven Type
Electric
Voltage
380V
Power
50Hz
After-Sales Service Provided
Engineers Available to Service Machinery Overseas
Transport Package
Film Wrapping Plus Sea Worthy Wooden Case
Specification
CE, ISO, UL
Trademark
Sunswell
Origin
Jiangsu, China
HS Code
8422301090
Production Capacity
5000-30000bph

Product Description

 

Product Description

Liquid Beverage Juice Filling Bottling Machine


Introduction:
Hot filling machine is the standard 3-in-1 monoblock. But to the special production condition, another sanitizer rinsing could be added, that is 4-in-1 monoblock. The system has fully considered the beverage's characteristics( such as the frothing of the tea drink and mixed juice) and the technical requirement of the hot filling.

Technical features:
1, Full filling is to avoid the bottle from sinking after the bottle cooling off, and to decrease the dissolved oxygen to the utmost extent.
2, Reasonable structured storage hopper and material supply system keep the material in the constant flow speed, constant pressure and without frothing. Usually high position tank is adopted.
3, The storage hopper has the characteristic of gas discharge, full sealing and temperature detecting. In moderate and high speed production line, the material distributor replaces the big liquid tank to realize the complete CIP.
4, Sanitary filling head system is of umbrella structure, high filling speed.
5, Perfect filling temperature control system.
6, Return tank system has the function of supplying the material automatically.
7, Perfect CIP system

The complete line includes:
Water treatment system;
Beverage pretreatment system;
Blow molding system;
Filling system;
Downstream packaging system: Labeling machine, packing machine, palletizing system, etc.

Technical Parameters:
Number of Filling Valves 12,16,24, 32, 40, 50, 60, 72,
Filling Speed 5, 000-30, 000BPH (500ml)
Type of Bottles PET Bottles of various shapes
Bottle Height 150-320(mm)
Bottle Diameter φ 50-110(mm)
Filling Temperature Hot Filling
Filling Principle Gravity Filling
Filling Product Apple juice, orange juice, flavored milk, tea drinks, energy drinks, vitamin drinks and etc.

 

About Sunswell


Liquid Beverage Juice Filling Bottling MachineLiquid Beverage Juice Filling Bottling MachineLiquid Beverage Juice Filling Bottling MachineLiquid Beverage Juice Filling Bottling MachineLiquid Beverage Juice Filling Bottling Machine
Packaging & Shipping:
Liquid Beverage Juice Filling Bottling Machine
FAQ:

Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai.  We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.

Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.

Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.

Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed. Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.

Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.

Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units to save international courier such as DHL, it is really costly.

Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.

Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now