24000bph Glass Bottled Beer Filling Line

Product Details
Customization: Available
After-sales Service: 1 Year
Warranty: 12 Months
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (19)
  • 24000bph Glass Bottled Beer Filling Line
  • 24000bph Glass Bottled Beer Filling Line
  • 24000bph Glass Bottled Beer Filling Line
  • 24000bph Glass Bottled Beer Filling Line
  • 24000bph Glass Bottled Beer Filling Line
  • 24000bph Glass Bottled Beer Filling Line
Find Similar Products

Basic Info.

Model NO.
BPGY80-18
Fuction
Washing, Filling, Sealing
Suitable
Glass Bottle, Can
Application
Beer, Carbonated Drinks,Cola, Soda Water
Capacity
3, 000bph~24, 000bph(500ml)
Certificate
CE, ISO, SGS
Control
PLC Control+Touch Screen
Filling Valve
High Speed Filling Valve
Structure Material
Stainless Steel Food Grade
Delivery Time
50 Days After Payment
Install
Engineers Available to Serivece Overseas
Transport Package
Export Standard Wooden Case
Specification
SUS304
Trademark
SUNSWELL
Origin
Zhangjiagang, China
HS Code
8422301090
Production Capacity
100units Per Year

Product Description

24000bph Glass Bottled Beer Filling Line
24000bph Glass Bottled Beer Filling Line
Description:

Sunswell beer washing filling capping 3-in-1 unit has the latest technology in accordance with the technological requirements for packaging beer in glass bottles by adopting advanced technologies both at home and abroad. Meanwhile, we are able to provide complete high-efficiency beer filling production line for the beer breweries.

Our beer filling machine is the introduction of German technology, through digestion and absorption, combined with the characteristics of China's beer industry, beer filling and capping designed washing equipment, this machine adopts gear transmission. Stable conveying, filling is stable and reliable, convenient adjustment, the machine is set with automatic control for bottle and no bottle cap and no cap, stable performance.Advanced technology.The whole size can be accommodated in standard containers for convenient transportation.

We use double vacuum pumping technology to minimize the content of Oxygen to keep the taste of beer fresh and shelf life time long.

24000bph Glass Bottled Beer Filling Line

Rinser:
The new bottle is transported through the separation screw and starwheel by the clamp and turn over device; bottle neck is held up words, after aseptic water rinsing, the bottle neck goes up and transported to another process.

24000bph Glass Bottled Beer Filling Line

Filling machine part:

A. Filling valve adopts double vacuum to avoid oxygen left in bottles and prolong beer shelf life, with isobaric mechanical valve, High speed and big flow, the high accuracy filling valve, filling speed fast, the liquid level is stable.
B. Main drive adopt gear drive independent, high efficiency, small noise, long life, maintenance-free, transducer can control the main motor speed, the machine adopt Variable-frequency variable speed, whole operations area, motor base is stainless steel contain carbon steel.
C. Guide bottle system, simple structure, according to bottle style ,can change
D. The whole machine can be controlled automatically by PLC.
E. Filling product liquid level height adopts liquid level probe control, liquid level steady, filling reliable.
F.  The machine important parts and electrical elements is import production.
G. Filling product can be controlled automatically and have CIP washing connector.

24000bph Glass Bottled Beer Filling Line

Crown cap capping part:
The bottle into the click wheel through the transition card bottleneck Capping Machine. Rotary Capping Machine knife stuck on the only bottleneck location, keeping the bottle upright and prevent rotation. Capping Machine Capping head to remain in the revolution and rotation, under the action of the cam to achieve grasping cap, capping, press cap, cap off action, complete the capping process. Management Capping Machine is located in the top cover, through drop-cap rail and cover plate connected Capping Machine allocated. Finished bottle through the bottle capping machine sent from the click wheel to the bottle conveyor chains, conveyor chains send out the triple play by the filling machine, into the next process.


24000bph Glass Bottled Beer Filling Line


Beer bottling line Main configuration:
1) Material of filling valve: Stainless steel SUS316L.
2) Material of rotary tray and machine platform of rinser and filler: Stainless steel SUS304.
3) Main motor: Simens
4) Sliding bearing: Igus.
5) Frequency inverter: Mitsubishi.
6) Touch screen: Mitsubishi
7) PLC: Mitsubishi.
8) Pneumatic components: Airtac.

24000bph Glass Bottled Beer Filling Line

24000bph Glass Bottled Beer Filling Line

Beer bottling line Parameter:
 
Model Capacity Power Dimension Weight
GF 18-18-6 6000BPH 1.5KW 2000X1600x2550 3000
GF 24-24-8 9000BPH 3KW 2200x1820x2550 3500
GF32-32-8 12000BPH 4 KW 2300x2030x2550 4000
GF 40-40-10 15000BPH 5KW 2500x2200x2550 4500


Flow chart:
Complete water production line

24000bph Glass Bottled Beer Filling Line
Water treatment → Blow molding machine → Unscrambler → Filling machine →
 

24000bph Glass Bottled Beer Filling Line
Blowing-filling-capping combiblock  → Sleeve / opp labeler → Shrink wrapper / wrap-round case packer →
Palletizer


About Sunswell:
Set up in 2008, Sunswell leads the market in the field of liquid bottling, blow molding, labeling, packaging machinery and process technology for water, tea, juice, carbonated drinks, energy drinks, liquid, beer, edible oil, dairy and daily care products, etc.

We can customize liquid food production lines according to customers' demand. Every customer is the result of our proven experience and innovation. We continually focus on providing customers with advanced technology, engineering and facility that are designed with one motto in mind: ensure you to reach business goals with most optimized planning.

Why choose us?
(1)A to Z turnkey plant provider
(2)Fully automatic or economic solution optional
(3)10+ years of global market experience
(4)Serve customers over 50 countries and regions worldwide


24000bph Glass Bottled Beer Filling Line

Advantage:

No matter whether you're a newcomer or a sectoral expert - we have the specialists who can provide the comprehensively can-do support you need for planning a new facility in terms of not only actual beverage production, but also filling, packaging, utilities and logistics. In closely responsive consultation with you, from a multiplicity of possible options, we select the technologically and commercially most effective variant, handle the design and planning work, and bring the project to a successful conclusion at your chosen location. Sunswell is not only the consultant here, but also takes responsibility for executing the entire project.


24000bph Glass Bottled Beer Filling Line

Related Products:


24000bph Glass Bottled Beer Filling Line


FAQ:
Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.

Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.

Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.

Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed. Or you can arrange engineers to study in our factory. 
You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.

Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.

Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units to save international courier such as DHL, it is really costly.

Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.

Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.


Any more questions, pls feel free to contact me !
sunswell.en.made-in-china.com

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
People who viewed this also viewed