Drinking Water Bottling Line 300 Bottles 5 Gallons Per Hour.

Product Details
Customization: Available
Machinery Name: Bottled Mineral Water Bottling Filling Sealing Mac
Application: Bottling and Packing Water
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (19)
  • Drinking Water Bottling Line 300 Bottles 5 Gallons Per Hour.
  • Drinking Water Bottling Line 300 Bottles 5 Gallons Per Hour.
  • Drinking Water Bottling Line 300 Bottles 5 Gallons Per Hour.
  • Drinking Water Bottling Line 300 Bottles 5 Gallons Per Hour.
  • Drinking Water Bottling Line 300 Bottles 5 Gallons Per Hour.
  • Drinking Water Bottling Line 300 Bottles 5 Gallons Per Hour.
Find Similar Products

Basic Info.

Model NO.
filling machine
Material
Stainless Steel 304, 316L Available
Product Packaging
Plastic Bottle, Pet Bottle, Aluminum Bottle, Glass
Function
Rinser Filler Capper Rinsing Filling Capper
Bottle Volume
200ml-2200ml
Capacity
5000-40000bottles Per Hour
Filling Accuracy
0.5%
Warranty
2 Years
Driven Type
Electric
Control
PLC+ Touch Screen
Certification
Ce
Brand Name
Sunswell
Transport Package
Seaworthy Wooden Cases Plus Wrapping Film
Specification
CE, ISO, UL
Trademark
Sunswell
Origin
Zhangjiagang, Jiangsu, China
HS Code
8401309000
Production Capacity
150bph-1000bph

Product Description

Description:
3 in 1 monoblock bottle water making machine can be applied to the production of mineral water, purified water, flavor water and low alcoholic drinks, etc.The water filler machine can be used for different water filling line.
The whole machine is mainly composed of rinser, filler and capper.Drinking Water Bottling Line 300 Bottles 5 Gallons Per Hour.
Plastic drinking water processing machinetechnical parameters:
Number of filling valves 12, 16, 24, 32, 40, 50, 60, 72,
Filling speed: 5, 000-30, 000bph (500ml)
Type of bottles Pet bottles of various shapes
Bottle height 150-320(mm)
Bottle diameter Φ50-110(mm)
Filling temperature Ambient temperature
Filling principle Gravity filling
Filling product Mineral water, purified water, drinking water, flavor water and low alcoholic drinks.


Main features:
Rinser
Drinking Water Bottling Line 300 Bottles 5 Gallons Per Hour.
The rotary wheel is a fully sus304 stainless steel welded structure.
The machine applies unique overturning bottle clamp, which is an innovation of our company.This bottle clamp grips bottle at neck position, avoiding bottle mouth thread contamination caused by rubber gripper block of a traditional bottle clamp.Made of sus304 stainless steel, this bottle clamp is hygienic and durable.
The high efficiency atomizing spay nozzle installed on bottle clamp is capable of cleaning any part of bottle inner wall, and also saves rinsing water.
All sliding bushes of lifting device use igus (germany) anti-corrosion maintenance free bearing.
The rinser is driven by driving system positioned inside machine frame via gear transmission.
Transfer starwheel
Made of stainless steel of superior quality.
Equipped with bottle jam protection device.

Filler
Drinking Water Bottling Line 300 Bottles 5 Gallons Per Hour.
Rotary wheel fully made of stainless steel sus 304.
Gravity filling method.
Filling valves are made of sus316l.
Filling valves are reasonably structured with accurate filling.
Filling flow can reach 200ml per second.
Bottles go up and down in the function of cam through elevator, to process filling with contact to bottle-mouth.
Level of cylinder is controlled with float-ball.
Filler is driven through gears inside the machine frame.
Link-wheels in rinser, filler and capper are transported in ringed support of bottle-neck

Capper
Drinking Water Bottling Line 300 Bottles 5 Gallons Per Hour.
Capper is the machine with highest precision, influence very much with the stability and reliability of the filling monoblock.Our capper features as follows:
Cap distributing chute is equipped with reverse cap stop and reverse cap pick-out mechanism.
Cap distributing chute is equipped with a photocell switch to stop the capper when there is no cap inside the chute.
The capper is equipped with inlet bottle detection switch.
Centrifugal way of cap arranging is adopted to reduce damage of caps.
A cap inspecting system is applied to control on-off of elevator.

Frame
Drinking Water Bottling Line 300 Bottles 5 Gallons Per Hour.
The machine frame is a welded structure of high quality carbon steel with the surface anti-rust treated and coated.The machine frame is wrapped with stainless steel sheet (ansi304).
Driving system of the 3-in-1 unit is positioned under the machine table.One main motor provides driving power via gear transmission.
The gear transmission system is an interleaved arrangement of steel gears and nylon gears.
The output shaft of the main motor is equipped overload protection to secure machine safety.
Electrical control
The electrical cabinet is made of coated carbon steel.From bottle infeed to bottle discharge, a plc controls the fully automatic operation of the 3-in-1 unit.
 

Flow chart:
Complete water production line

Drinking Water Bottling Line 300 Bottles 5 Gallons Per Hour.
Water treatment → Blow molding machine → Unscrambler → Filling machine →
 

Drinking Water Bottling Line 300 Bottles 5 Gallons Per Hour.
Blowing-filling-capping combiblock  → Sleeve / opp labeler → Shrink wrapper / wrap-round case packer →
Palletizer

Suitable Bottles:
300ml,500ml,1L,1.5L,5L,3Gallon,5Gallon
Drinking Water Bottling Line 300 Bottles 5 Gallons Per Hour.



About Sunswell:
Set up in 2008, Sunswell leads the market in the field of liquid bottling, blow molding, labeling, packaging machinery and process technology for water, tea, juice, carbonated drinks, energy drinks, liquid, beer, edible oil, dairy and daily care products, etc.

We can customize liquid food production lines according to customers' demand. Every customer is the result of our proven experience and innovation. We continually focus on providing customers with advanced technology, engineering and facility that are designed with one motto in mind: ensure you to reach business goals with most optimized planning.

Why choose us?
(1)A to Z turnkey plant provider
(2)Fully automatic or economic solution optional
(3)10+ years of global market experience
(4)Serve customers over 50 countries and regions worldwide



Drinking Water Bottling Line 300 Bottles 5 Gallons Per Hour.


Advantage:

No matter whether you're a newcomer or a sectoral expert - we have the specialists who can provide the comprehensively can-do support you need for planning a new facility in terms of not only actual beverage production, but also filling, packaging, utilities and logistics. In closely responsive consultation with you, from a multiplicity of possible options, we select the technologically and commercially most effective variant, handle the design and planning work, and bring the project to a successful conclusion at your chosen location. Sunswell is not only the consultant here, but also takes responsibility for executing the entire project.


Drinking Water Bottling Line 300 Bottles 5 Gallons Per Hour.

Related Products:


Drinking Water Bottling Line 300 Bottles 5 Gallons Per Hour.


FAQ:
Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.

Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.

Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.

Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed. Or you can arrange engineers to study in our factory. 
You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.

Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.

Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units to save international courier such as DHL, it is really costly.

Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.

Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.


Any more questions, pls feel free to contact me !
sunswell.en.made-in-china.com

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
People who viewed this also viewed