Full Automatic Plastic Injection Moulding Machine / Equipment
This model of fully automatic rotary blow molding machinery is specially designed for high speed based on absorbing all international latest technology, it is mainly used in producing pure water bottle and carbonated soft drink bottle. With reasonable construct, less area taking, less utility consumption, stable capacity, it meets national food safety requirements.
Main advantages
This machine is operated by TFT touch screen, several languages can be selected, and it is easy to operate with some multi-layer menu. Speed, technical data are displayed in the screen, so it is very easy to operate.
- Special design of two steps blowing system, the pressure figure in the mould is scouted timely, so it can supply figure for operator to adjust. It will be helpful to the stability of bottle size.
- Heating device adopted nine sections infrared to adjust the temperature, preheating area and adjusting area can be controlled according different technical requirements. To make sure the stability of techniques, the temperature is scouted all day.
- The heating temperature can be adjusted according different perform and bottle size, you just need to input settled figure when you change different performs.
- Equipped with automatic perform unscramble and elevator.
-
Main Mechanical Part
- Material: aluminum alloy, carbon iron, stainless steel, alloy steel.
- Bearing: import from Japan and Germany. Self-lubricating grease bearing from Igus.
- High-pressure air valve: Norgren (Switzerland), Lucifer Parker (Switzerland), SMC (Japan), Seitz (Switzerland)
- High-pressure vent muffle: Automuffler (USA)
- Control pneumatic cylinder: Norgren (Switzerland), Lucifer Parker (Switzerland), SMC (Japan).
TYPE |
ITEM |
BX-600 |
BX-1500 |
BX-2500 |
BX-5000 |
CONTAINER |
Number of cavity |
1 |
1 |
1 |
1 |
Theoretical output |
1200-1400pcs/hr |
1000-1300 pcs/hr |
800-1200 pcs/hr |
500-700 pcs/hr |
Max.container volume |
0.6L |
1.5L |
2.5L |
5L |
Max.neck diameter |
65mm |
80mm |
90mm |
120mm |
Max.container diameter |
80mm |
105mm |
115mm |
200mm |
Max.container height |
260mm |
330mm |
350mm |
350mm |
ELECTRICAL SYSTEM |
Number of lamp |
12pcs(1500w/pcs) |
16 pcs(1500w/pcs) |
16 pcs(1500w/pcs) |
24pcs |
Max.heating power |
18kw |
24kw |
24kw |
36kw |
Installation power |
18.5kw |
24.5kw |
24.5kw |
40kw |
Actual power consumption |
8-12kw |
10-12kw |
12-14kw |
16-20kw |
AIR SYSTEM |
Operatating pressure |
7kg/c |
7kg/c |
7kg/c |
7kg/c |
Low pressure consuming |
800Ltr/min |
900 Ltr/min |
900 Ltr/min |
1200 Ltr/min |
Blowing pressure |
≤40kg/c |
≤40kg/c |
≤40kg/c |
≤40kg/c |
High pressure consuming |
1200-1600Ltr/min |
1200-1600Ltr/min |
1200-1600Ltr/min |
2000-2500Ltr/min |
WATER CHILLER |
Operating pressure |
5-6 kg/c |
5-6 kg/c |
5-6 kg/c |
5-6 kg/c |
Temperature |
10 |
10 |
10 |
10 |
Consuming |
3600kcal/hr |
3600kcal/hr |
3600kcal/hr |
5600kcal/hr |
Flow rater |
20Ltr/min |
20Ltr/min |
20Ltr/min |
30Ltr/min |
MACHINE |
Machine dimension |
2.2×1.5×1.8(m) |
2.4×1.6×1.8(m) |
2.5×1.7×1.8(m) |
2.2×1.8×1.7(m) |
Machine weight |
1.3T |
1.5T |
1.7T |
2.8T |
Any more questions, pls feel free to contact us at any time!
Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.
Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.
Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.
Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If
needed.Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.
Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.
Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units tosave international courier such as DHL, it is really costly.
Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.
Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.