• Pet Bottled Drinking Water Blowing Filling Capping Combiblock Bottling Production Line
  • Pet Bottled Drinking Water Blowing Filling Capping Combiblock Bottling Production Line
  • Pet Bottled Drinking Water Blowing Filling Capping Combiblock Bottling Production Line
  • Pet Bottled Drinking Water Blowing Filling Capping Combiblock Bottling Production Line
  • Pet Bottled Drinking Water Blowing Filling Capping Combiblock Bottling Production Line
  • Pet Bottled Drinking Water Blowing Filling Capping Combiblock Bottling Production Line

Pet Bottled Drinking Water Blowing Filling Capping Combiblock Bottling Production Line

After-sales Service: Online Service
Warranty: One Year
Condition: New
Customized: Customized
Voltage: 380V
Composition: Filling Machine
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2011

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (19)
  • Overview
  • Product Description
  • FAQ
Overview

Basic Info.

Model NO.
BFC
Processing Material
Natural Ingredients
Process
Frozen and Chilled
Model No.
Bfc
Filling Principle
Gravity Filling
Dimension
6500*3150*2990mm(L× H× W)
Function
Water, Juice, Carbonated Drinks
Speed
12000-36000bph
Certification
Ce UL CAS
Material
SS304
Machine Guarantee
2 Year
Bottle Shape
Customized, Less Than 2L
Shippine Date
120days
After Sales Service
Engineers Fly to Client Factory
Suitable for
Pet Bottles
Transport Package
Wooden Case
Specification
6750*4835*2700mm
Trademark
SUNSWELL
Origin
China
HS Code
8422301090
Production Capacity
10PCS/Year

Product Description

 
Product Description

 

PET Bottled Drinking Water Blowing Filling Capping Combiblock Bottling Production Line Equipment

Pet Bottled Drinking Water Blowing Filling Capping Combiblock Bottling Production Line
Pet Bottled Drinking Water Blowing Filling Capping Combiblock Bottling Production Line

Product Working Process:

1. Preform feed-in and unscrambling

Pet Bottled Drinking Water Blowing Filling Capping Combiblock Bottling Production Line

It adopts the matured worldwide-standardized way of preform feed-in and unscrambling, in which preforms go through preform elevator and are transmitted to preform unscrambler. Inside the preform unscrambler, preforms are automatically sorted and delivered by two inclined revolving cylinders with same speed, and the remaining ones will be picked by star wheel and sent back to preform hopper. The whole process of preform unscrambling is fully automatic and has high efficiency without preform scratches.

2. Heater

Pet Bottled Drinking Water Blowing Filling Capping Combiblock Bottling Production Line

It adopts the matured worldwide-standardized way of preform feed-in and unscrambling, in which preforms go through preform elevator and are transmitted to preform unscrambler. Inside the preform unscrambler, preforms are automatically sorted and delivered by two inclined revolving cylinders with same speed, and the remaining ones will be picked by star wheel and sent back to preform hopper. The whole process of preform unscrambling is fully automatic and has high efficiency without preform scratches.

3Blowing unit

Pet Bottled Drinking Water Blowing Filling Capping Combiblock Bottling Production Line

Special manipulator delivers heated preforms to moulds along certain cam curve. After stretch pre-blow, the preform will be blown to bottles by connecting high pressure compressed air. Special manipulator sends the finished bottle out along certain cam curve.

4. Filling unit

Pet Bottled Drinking Water Blowing Filling Capping Combiblock Bottling Production Line

The blow-made bottles are transported to filler via starwheel. After entering filler, the bottle is held by gripper of lifting cylinder and realizes up and down under effect of cam.
The filler adopts gravity filling way. Bottle mouth rises to open filling valves and start filling. While product rises and plugs up air return hole, the filling will be finished. After filling, bottle mouth moves down and leaves the filling valve.

5. Capping unit

Pet Bottled Drinking Water Blowing Filling Capping Combiblock Bottling Production Line

Bottles enter capper via transition starwheel. The anti-rotation knife of capper blocks bottle neck to keep bottle vertical and prevent rotation. Capping heads keep revolution and do rotation. Under effect of cam, the action of gripping cap, sleeve cap, screwing cap and discharging cap to finish the whole capping course. The finished bottles are conveyed via bottle-out starwheel onto bottle-out conveyor, and then are sent out of the combiblock. The whole machine adopts console sealing windows, beautiful and decent.
 
NO.
Model
Capacity
Remark
1
6-24-8
12000BPH
500ml
2
8-32-10
16000BPH
500ml
3
12-40-15
24000BPH
500ml
4
18-60-22
36000BPH
500ml

Model For water Bottling Line:
Please feel free to contact us if you're interested in our products!




Pet Bottled Drinking Water Blowing Filling Capping Combiblock Bottling Production LinePet Bottled Drinking Water Blowing Filling Capping Combiblock Bottling Production LinePet Bottled Drinking Water Blowing Filling Capping Combiblock Bottling Production LinePet Bottled Drinking Water Blowing Filling Capping Combiblock Bottling Production LinePet Bottled Drinking Water Blowing Filling Capping Combiblock Bottling Production Line


 
FAQ

Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai.  We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.

Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.

Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.

Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed. Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.

Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.

Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units to save international courier such as DHL, it is really costly.

Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.

Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.

 

Any more questions, please feel free to contact us!

Salesperson: Alex Hou
Mobile: 0086 136 0622 5421
Tel: 0086 512 5850 1665
Website: sunswell.en.made-in-china.com  

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now