Semi Automatic Drinking Water Production Project Line for Mineral Water or Pure Water

Product Details
Customization: Available
Condition: New
Customized: Customized
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (19)
  • Semi Automatic Drinking Water Production Project Line for Mineral Water or Pure Water
  • Semi Automatic Drinking Water Production Project Line for Mineral Water or Pure Water
  • Semi Automatic Drinking Water Production Project Line for Mineral Water or Pure Water
  • Semi Automatic Drinking Water Production Project Line for Mineral Water or Pure Water
  • Semi Automatic Drinking Water Production Project Line for Mineral Water or Pure Water
  • Semi Automatic Drinking Water Production Project Line for Mineral Water or Pure Water
Find Similar Products

Basic Info.

Model NO.
XGF-xx-xx-xx
Voltage
Customized
Composition
Filling Machine
Filling System
Gravity Filling
Capacity
5000bph~36000bph(500ml)
Suitable
Pet Bottles
Application
Still Water,Pure Water,RO Water,Mineral Water,etc
Bottle Range
0.2L~2.0L
Warranty
12 Months
Packaging
Bottle
Certificate
Ce, ISO,SGS
Dosing Device
Plunger
Packaging Material
Film
Control
PLC Control+Touch Screen
Filling Valve Head
Multi-Head
Filling Valve
High Speed Valve
Feed Cylinder
Single Room Feeding
After Sales Sevices
Engineers Available to Serivece Overseas
Transport Package
Wooden Case
Trademark
SUNSWELL
Origin
China
HS Code
8422301090
Production Capacity
100sets/Year

Product Description

1.Description:
3-in-1 filling machine, combined with rinsing, filling and capping. It is innovated and designed in the requirement of still pure water and mineral water, on the bases of introducing, digesting and absorbing advanced technology from Germany and Italy. 

2.Main features

1). Rinser
Semi Automatic Drinking Water Production Project Line for Mineral Water or Pure Water

Spring cramps are used in the bottle washing process. The empty bottles can be turned over 180° Along the conveying rail. There are two times of internal and external washing, the efficiency of bottle washing is high.

Rinsing machine adopts Sunswell original oVERTUrn and double-opened bottle clip. Bottle clip lock the bottleneck, the material of bottle clip is SUS304, which is hygienic and durable.

Bottle clip equipped with efficient spray on nozzle. The extrusive droplet with 15° Angle ensures to wash all side of the bottle, and can save the water.

Made of stainless steel of superior quality.
Equipped with bottle jam protection device.

2). Filler
Semi Automatic Drinking Water Production Project Line for Mineral Water or Pure Water

The design of filling structure is reasonable and hygiene dead angle, the run of equipment is stable, it can control the material from the bottleneck, the control accuracy is within ± 2mm (subject to bottle design). The filling valve material is SUS304. The filling system has liquid level automatic control. Filling valve lift is controlled by the valve elevator, after filling valve contact the bottleneck, it start to fill. Bottle is conveying by the wheel in the filling part.

3). Capper
Semi Automatic Drinking Water Production Project Line for Mineral Water or Pure Water

Screw capping machine is most precision part in the 3-1 machine, it has a big influence to the goods stability and defective rate. Our screw capping has following feature:

Magnetic constant torque capping head ensures stability and controls defective rate of capping less than 0.2%.
B  Cap dropping rail equips a group of photoelectrical switch for reverse cap detecting. When lack of cap, machine will be stopped automatically.
Bottle infeed detecting switch works with the pneumatic cylinder on cap starwheel to avoid feeding cap on no-bottle condition

Main configuration
 Touch screen: Pro-face
PLC program controller: Mitsubishi
Inverter: Mitsubishi
Photoelectrical controller: Leuze
Proximity switch: Leuze
Other electrical components: Schneider
Pneumatic component: Festo
Water pump: Nanfang
Main motor: ABB or SEW

3.Technical features of water filling machine
1).     It is adopted direct connection between air conveyor and inlet starwheel instead of screw and conveyor chains,which is easier for bottle changing.
2).    Tthere is no need to adjust the height of equipments through neck holding tech for bottle transportaion.And it is only need to change some spare parts .
3).    High speed and large flow filling valve assures the high filling speed  and precise fluid level.
4).    The electric system is mand of international brand.
 
Model XGF14-12-5 XGF16-16-5 XGF24-24-6 XGF-32-32-8 XGF-40-40-10 XGF-50-50-12 XGF-60-60-15 XGF-72-50-18 XGF-80-60-20
Capacity
(BPH/500ml)
5,000 7,000 10,000 15,000 18,000 21,000 24,000 30,000 36,000
XGF-xx-xx-xx:  The 1st xx---heads of rising ,the 2nd xx---heads of filling ,the 3rd xx---heads of capping

4.Associated equipments
The working efficiency of the production line is largely decided by the associated equipments,We provide a scientific and stablity proposal for all our clients.

1). Water treatment systerm                                 2).Linear cap sterilizer

Semi Automatic Drinking Water Production Project Line for Mineral Water or Pure WaterSemi Automatic Drinking Water Production Project Line for Mineral Water or Pure Water

3). Automatic blowing machine                            4). Semi-automatic blowing machine

Semi Automatic Drinking Water Production Project Line for Mineral Water or Pure WaterSemi Automatic Drinking Water Production Project Line for Mineral Water or Pure Water

5).Cap elevator                                                   6).Bottle buffer and conveyor     

Semi Automatic Drinking Water Production Project Line for Mineral Water or Pure WaterSemi Automatic Drinking Water Production Project Line for Mineral Water or Pure Water

7).Blow dryer                                                         8).Labeling machine

Semi Automatic Drinking Water Production Project Line for Mineral Water or Pure WaterSemi Automatic Drinking Water Production Project Line for Mineral Water or Pure Water

9).Film shrink machine

Semi Automatic Drinking Water Production Project Line for Mineral Water or Pure Water

5).Others
 
A. After-sale service I. Sunswell offers  you high quality machines with 1 year guarantee and supply life-long technical support
II. Sunswell provides recommended spare parts. 
III. Sunswell provides the instruation book for the machines operation and maintenace troubleshooting. And normally, the language of instruction book is Engligh. 
B. Installation I. Before machines are delivered into your factory, your esteemed company need to prepare the water, electricity, etc...When machines reached at your factory, engineers from Sunswell will go to your factory within two week, to finish the machines installation and train your staffs. 
C. Sample service I. For the machines operation & maintenace troubleshooting, you completely don't worry about that. When all machines have been manufacturered, Sunswell will take the video about machines operating, then show that to you. 
II. You are welcome to come to visit Sunswell factory, and see the machine running. 
III. If we get the permission of the customers who have bought the machines from us, we can provide you their contact information and you can go and visit. 
D. Payment term 30% T/T in advance  and the balance be cleared before shipment 

6).FAQ.

Q:Can your factory make the bottle drawing, workshop layout, and labels for us? 
A:We can help customers design their own bottle shape, workshop layout and label drawings, these jobs are free charge.

Q: Can your factory provide the whole plant from A to Z?
A: Yes, we can provide the complete plant, from bottling making plant, water purification plant, to filling packing plant. 


Q: How long Is the warranty period?
A: All of our products have one year warranty


Q: What's your delivery time and payment Terms?
A:Normally,it need about 10-30 days.The exact time depends on your quantity. The payment terms always 30% deposits,70% to be paid before shipment

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
People who viewed this also viewed