Complete Tunkey Pet Bottle Soda Water Soft Drink Sparkling Liquid Bottled Beverage Juice Energy CSD Carbonated Bottling Filling Capping Production Line Machine

Product Details
Customization: Available
Type: Filling Machine, Volumetric Filling Machine
Automatic Grade: Automatic
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (19)
  • Complete Tunkey Pet Bottle Soda Water Soft Drink Sparkling Liquid Bottled Beverage Juice Energy CSD Carbonated Bottling Filling Capping Production Line Machine
  • Complete Tunkey Pet Bottle Soda Water Soft Drink Sparkling Liquid Bottled Beverage Juice Energy CSD Carbonated Bottling Filling Capping Production Line Machine
  • Complete Tunkey Pet Bottle Soda Water Soft Drink Sparkling Liquid Bottled Beverage Juice Energy CSD Carbonated Bottling Filling Capping Production Line Machine
  • Complete Tunkey Pet Bottle Soda Water Soft Drink Sparkling Liquid Bottled Beverage Juice Energy CSD Carbonated Bottling Filling Capping Production Line Machine
  • Complete Tunkey Pet Bottle Soda Water Soft Drink Sparkling Liquid Bottled Beverage Juice Energy CSD Carbonated Bottling Filling Capping Production Line Machine
  • Complete Tunkey Pet Bottle Soda Water Soft Drink Sparkling Liquid Bottled Beverage Juice Energy CSD Carbonated Bottling Filling Capping Production Line Machine
Find Similar Products

Basic Info.

Model NO.
gf
Material Type
Liquid
Filling Valve Head
Multi-Head
Feed Cylinder Structure
Single-Room Feeding
Dosing Device
Surface Type
Filling Principle
Pressure
Packaging Container Lifting Structure
Pneumatic Lifting
Structure
Rotary
Packaging
Bottle
Packaging Material
Plastic
Name
Stainless Steel 304 Soda Water Sparkling Water Gas
Capacity
5000-28000bottles Per Hour
Bottle Volume
200ml-2200ml
Application
Beverage, Carbonated Soft Drinks, Soda Water
Filling Accuracy
0.5%
Machine Material
SUS304/SUS316
Machine Structure
Rinser, Filler, Capper 3 in 1 Monoblock
Warranty
1 Year
Packaging Type
Bottles
Condition
New
Driven Type
Electric
Transport Package
Film Wrapping Plus Seaworthy Wooden Case
Specification
2400x1650x2500mm
Trademark
SUNSWELL
Origin
Zhangjiagang
HS Code
8501109101
Production Capacity
60sets/Year

Product Description

Application :
Carbonated Soft drinks , soda water , sparkling water ,CO2 gas water, fizzy water, CSD , fizzy drinks, gas drinks ,cola ,carbonating water ,carbonate water.
 
Bottle volume :
0.2L-2L
(Big than 2L bottle volume,we have other machinery can meet your 2L -20L bottle volume requirement) .
 
The carbonated soft drinks water machinery combiblock is composed by :
RINSER-FILLER-CAPPER 3 in 1 monoblock

Complete Tunkey Pet Bottle Soda Water Soft Drink Sparkling Liquid Bottled Beverage Juice Energy CSD Carbonated Bottling Filling Capping Production Line Machine
       
Equipment structure:
1. Rinsing system: Combined with rotary tray with clamp, water distributing tray, water tank and rinsing
pump.
2. Filling system: Combined with hydraulic, filling valve, controlling ring, and elevator-cylinder.
3. Capping system: Combined with capper, cap sorter and cap falling track.
4. Driving system: Combined with main motor and gears.
5. Bottle transmitting system: Combined with air conveyor, steel starwheels and neck supporting carrier plates.
6. Electrical controlling system: this part is frequency inverted, PLC controlled and touch screen operated.
Complete Tunkey Pet Bottle Soda Water Soft Drink Sparkling Liquid Bottled Beverage Juice Energy CSD Carbonated Bottling Filling Capping Production Line Machine

Main components configuration:
1. Material of filling valve: Stainless steel 316L available
2. Material of rotary tray and machine platform of rinser and filler: Stainless steel 304.
3. Main motor: ABB/SEW (Germany)
4. Sliding bearing: Igus (Germany)
5. Frequency inverter: MITSUBISHI (Japan)
6. Touch screen: DIGITAL (Japan).
7. PLC: MITSUBISH (Japan)
8. Pneumatic components: FESTO (Germany)
9. Seals: Busak+Shamban (USA)
10. Photocell switch: BANER (USA).
11. Proximity switch: TURCK (Germany).
(Big than 2L bottle volume,we have other machinery can meet your 2L -20L bottle volume requirement) .

We can also provide turnkey/complete bottling carbonated soft drinks  beverage production line :
1. Beverage/carbonate soft drinks  preparation system ( sugar melting/dissolve , soft drinks blending tank ,CIP)
2. Carbonating mixer(CO2 mixer) 
3.Bottle blowing system make PET plastic bottles ( Semi automatic / Fully automatic )
4. Water treatment system purify water  (Sand filter,carbon filter,RO/UF ,Ozone sterilizer,UV sterilizer and etc.)
5. Air conveyor for empty bottle loading
6. Rinser-filler-capper 3 in 1 monoblock
7. Cap loader load caps
8. Code printer (Ink-jet printer/ laser-jet printer)
9. Labeling machine ( PVC sleelve labeling machine /OPP hot melt glue labeling machine/Self-adheisive labeling machine )
10. End packaging ( PE shrink wrapping machine / Carton packing machine )

Carbonated soft drinks beverage machinery Technical Model : 
Model  Stable Capacity@500ml
(bottle/hour)  
Remarks 
DXGF18-18-6  3000BPH   
DXGF24-24-6 6000BPH  
DXGF24-32-8 9000BPH  
DXGF40-40-10 12000BPH   
DXGF50-50-12  15000BPH  
DXGF60-60-15 20000BPH  
DXGF72-72-15 24000BPH  

Project pictures:
Complete Tunkey Pet Bottle Soda Water Soft Drink Sparkling Liquid Bottled Beverage Juice Energy CSD Carbonated Bottling Filling Capping Production Line Machine

Presales Consultation :
Complete Tunkey Pet Bottle Soda Water Soft Drink Sparkling Liquid Bottled Beverage Juice Energy CSD Carbonated Bottling Filling Capping Production Line Machine

  
                  (Bottel Design )                                                (Factory Production Line Layout Design



Machinery container Loading : 
Complete Tunkey Pet Bottle Soda Water Soft Drink Sparkling Liquid Bottled Beverage Juice Energy CSD Carbonated Bottling Filling Capping Production Line Machine


After service :
Complete Tunkey Pet Bottle Soda Water Soft Drink Sparkling Liquid Bottled Beverage Juice Energy CSD Carbonated Bottling Filling Capping Production Line Machine


                        (Installation)                                                                                (Spare Parts)


Complete Tunkey Pet Bottle Soda Water Soft Drink Sparkling Liquid Bottled Beverage Juice Energy CSD Carbonated Bottling Filling Capping Production Line Machine

                     (Sales on-site assistance)                                                         (Training)


Flow chart:
Complete water production line

Complete Tunkey Pet Bottle Soda Water Soft Drink Sparkling Liquid Bottled Beverage Juice Energy CSD Carbonated Bottling Filling Capping Production Line Machine
Water treatment → Blow molding machine → Unscrambler → Filling machine →
 

Complete Tunkey Pet Bottle Soda Water Soft Drink Sparkling Liquid Bottled Beverage Juice Energy CSD Carbonated Bottling Filling Capping Production Line Machine
Blowing-filling-capping combiblock  → Sleeve / opp labeler → Shrink wrapper / wrap-round case packer →
Palletizer


About Sunswell:
Set up in 2008, Sunswell leads the market in the field of liquid bottling, blow molding, labeling, packaging machinery and process technology for water, tea, juice, carbonated drinks, energy drinks, liquid, beer, edible oil, dairy and daily care products, etc.

We can customize liquid food production lines according to customers' demand. Every customer is the result of our proven experience and innovation. We continually focus on providing customers with advanced technology, engineering and facility that are designed with one motto in mind: ensure you to reach business goals with most optimized planning.

Why choose us?
(1)A to Z turnkey plant provider
(2)Fully automatic or economic solution optional
(3)10+ years of global market experience
(4)Serve customers over 50 countries and regions worldwide


Complete Tunkey Pet Bottle Soda Water Soft Drink Sparkling Liquid Bottled Beverage Juice Energy CSD Carbonated Bottling Filling Capping Production Line Machine

Advantage:

No matter whether you're a newcomer or a sectoral expert - we have the specialists who can provide the comprehensively can-do support you need for planning a new facility in terms of not only actual beverage production, but also filling, packaging, utilities and logistics. In closely responsive consultation with you, from a multiplicity of possible options, we select the technologically and commercially most effective variant, handle the design and planning work, and bring the project to a successful conclusion at your chosen location. Sunswell is not only the consultant here, but also takes responsibility for executing the entire project.

Complete Tunkey Pet Bottle Soda Water Soft Drink Sparkling Liquid Bottled Beverage Juice Energy CSD Carbonated Bottling Filling Capping Production Line Machine

Related Products:


Complete Tunkey Pet Bottle Soda Water Soft Drink Sparkling Liquid Bottled Beverage Juice Energy CSD Carbonated Bottling Filling Capping Production Line Machine


FAQ:
Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.

Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.

Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.

Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed. Or you can arrange engineers to study in our factory. 
You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.

Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.

Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units to save international courier such as DHL, it is really costly.

Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.

Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.


Any more questions, pls feel free to contact me !
sunswell.en.made-in-china.com

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
People who viewed this also viewed