Customization: | Available |
---|---|
Type: | Aseptic |
Automatic Grade: | Automatic |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
General description
The machine is used for 3 gallon & 5 gallon water filling, which is composed of washer, filling and capper.
Details of each machine
Cap Decapper
This model automatic decapper is special equipment for 5-gallon retrieving barrel. It does not damage caps.
This machine adopts computer control and its capacity can be adjusted. Cap pulling organismfrom AIRTAC adopt
pneumatic adjustment, which solves the problems of tolerance of barrel height and tolerance of barrel's mouth, and
increases cap pulling success greatly. 304 stainless machine frame and machine body.
Outer Brusher
Function: clean the external of 5 gallon bottles with brush and water
1. Rotary style to wash the bottle body.
2. Material of machine frame and body: all 304 Stainless Steel.
3. All 304 stainless steel pipeline, valve and connector, fine polish, no death corner
4. Linear washing style with ø350brush 1pc ø200 brush 3pcs 300*3 brush 20pcs
5. Water pump: with 304 stainless steel pump
6. Washing tank: size 500*300*600*1.2, 304 stainless steel
7. No bottles, no washing
Washing-filling-capping 3-in-1 Monoblock
1. 3-rows 12-washing stops. Everything stop is about 23 seconds
2. 304 stainless steel insert type filling nozzle, two time high precision filling, filling volume adjustable.
3. Water pump: 304 stainless steel pump. three washing pumps and one filling pumps.
4. Mitsubishi PLC controlling system, all full-automatic working, Schneider & Omron brand other electric parts
5. With AIRTAC brand air cylinder, F. R. L. Combination and Electromagnetism valve for air cylinder.
6. Machine frame and body: all 304 Stainless Steel, combine with clear fiber glass windows
Item | Type | Remark | |
Washing part | Number of bottle carrier / nozzles | 2 bottle carrier,12 sets spraying nozzles | homemade special rotary spray system |
Number of rows for washing | 6 rows (each row 2 bottle carrier) | ||
Number of rinsing pump | 6 sets of Lingxiao pump BLC series | disinfectant and tap water washing pump: 370KW, pure water washing pump:550KW |
|
Filling part | Number of filling pump | 2 set of Lingxiao BLC755 | |
Filling nozzle system | 2 sets of SS304 type | ||
Pressure valves | 4V210-08(AC 220V) | Airtac | |
Filters rugulators lubricators | AFC-2000 | Airtac | |
Pressure sensitive switch | YSNS-C110 | Airtac | |
Capping part | Automatic caps tank/caps chute | 100pcs caps tank (manual caps dosing) | |
Numbers of the capping chuck | 2 sets of sticking type | ||
Cylinder system | SC 50*50 x 2 sets, SC 50*525 x 1 set | Taiwan Airtac | |
cap-ahigning motor | 90YCJG60 1:30 | ||
Controlling unit | PLC system | K7M-DR20UE | korea LG |
proximity switch | Ni10-Q25-AN6x | TURKER | |
AC contactor | GMC-9 AC 220V | korea LG | |
signal relay | MY2NJ-AC 220V | Omron | |
air-leakage switch | C65N-16 4P/2P | MGE | |
Electromagnetic valves | pure water washing:ZCS-15L filling:ZCS-20L | ||
control panel | 1020-40-50 | ||
Speed gear motor | 2 sets of 0.75Kw pearl river motor | ||
station assign | adopt double row six stations wash the bottle,two are filling ,two are capping - the first,sencond and thrid station: dinsinfectant washing, the fourth station:drain, the fifth station:tap water washing, the sixth station: pure water washing |
||
input voltage | AC 220/380 V 50HZ | ||
Dimension | Machine size | 2950 x 780 x 1520mm |
Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.
Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.
Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.
Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed. Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.
Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.
Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units to save international courier such as DHL, it is really costly.
Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.
Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.