Complete Full Automatic Fresh Fruit Juice Processing Line Juice Filling Machine

Product Details
Customization: Available
After-sales Service: Online Support, Video Technical Support
Warranty: 1 Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (19)
  • Complete Full Automatic Fresh Fruit Juice Processing Line Juice Filling Machine
  • Complete Full Automatic Fresh Fruit Juice Processing Line Juice Filling Machine
  • Complete Full Automatic Fresh Fruit Juice Processing Line Juice Filling Machine
  • Complete Full Automatic Fresh Fruit Juice Processing Line Juice Filling Machine
  • Complete Full Automatic Fresh Fruit Juice Processing Line Juice Filling Machine
  • Complete Full Automatic Fresh Fruit Juice Processing Line Juice Filling Machine
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
RCGF
Type
Volumetric Filling Machine
Automatic Grade
Automatic
Material Type
Liquid
Filling Valve Head
Multi-Head
Feed Cylinder Structure
Multi-Room Feeding
Dosing Device
Surface Type
Filling Principle
Negative Pressure
Packaging Container Lifting Structure
Chute Lifting
Structure
Rotary
Packaging
Bottle
Packaging Material
Metal
Machinery Capacity
2000-24000bph
Filling Volume
200ml-2000ml
Applicable Industries
Manufacturing Plant, Food & Beverage Factory
Packaging Type
Bottles
Voltage
220V, 380V, Customized
Filling Material
Juice, Tea, Milk, Water
Filling Accuracy
5%
Warranty of Core Components
1 Year
Core Components
Motor, Pump, PLC
Bottle Type
Aluminum Bottle
Certification
CE, ISO
Marketing Type
Ordinary Product
Transport Package
Wooden Case
Specification
customized
Trademark
Sunswell
Origin
Zhangjiagang Jiangsu China
HS Code
8422301090
Production Capacity
50 Set/Sets Per Year

Product Description

 

Product Description

Aluminum Bottle Filliing Machine:

 

The filling machine is consisted of ringsing-filling-caping all together. It can fill mineral water, pure water and distill water etc. CGF water filling machine adpots the suspension design. It allows the machine to fill different type of the bottles. It is normally used as drinking water filling machine. However, it can also be used for fill Aluminum Bottle with fruit juice and tea at high temperature by simply change tha valve. It can be connected with our others machines to form the water filling machine and packaging machinery production line.
 

Complete Full Automatic Fresh Fruit Juice Processing Line Juice Filling Machine
Application :
CGF series mineral water filling machine and packaging machinery is a self-developed new product by our R&D department to meet the requirement of multi-usage demands for our customers.
It is suitable for filling and Capping beer and Juice carbonated soft drinks. It is equipped the advanced device,electrical
equipment, and pneumatic control technology. It has the characteristics of filling reposefully, high speed, liquid level control,
capping reliably, frequency conversion timing, less material loss. It can be equipped long-distance control system.
It is the preferred equipment for the medium beer and beverage plant.
Model
CGF12-12-5
CGF18-18-6
CGF24-24-8
CGF32-32-10
CGF40-40-12
CGF50-50-12
Washing, Filling and Capping Heads
12-12-5
18-18-6
24-24-8
32-32-10
40-40-12
50-50-12
Production capacity(500ml)
B/H
2000-4000
5000-7000
8000-12000
12000-15000
16000-20000
20000-24000
Motor power(kw)
2.2kw
2.2kw
3kw
5.5kw
7.5kw
11kw
Weight (kg)
2500
3500
4500
6500
8500
9800

 

Detailed Photos

1) Bottle infeed
Bottle infeed by combination of infeed starwheels.
Equipped with bottle jam protection device.                                                                                                        

Complete Full Automatic Fresh Fruit Juice Processing Line Juice Filling Machine

2) Discharge Starwheel
Nylon starwheel and conveyor belt work to discharge bottles.

Complete Full Automatic Fresh Fruit Juice Processing Line Juice Filling Machine
3)RinserComplete Full Automatic Fresh Fruit Juice Processing Line Juice Filling Machine
4) Filler
Complete Full Automatic Fresh Fruit Juice Processing Line Juice Filling Machine
5) Capper
Complete Full Automatic Fresh Fruit Juice Processing Line Juice Filling Machine

Equipment structure:
1. Rinsing system: Combined with rotary tray with clamp, water distributing tray, water tank and rinsing pump.
2. Filling system: Combined with hydraulic, filling valve, controlling ring, and elevator-cylinder.
3. Capping system: Combined with capper, cap sorter and cap falling track.
4. Driving system: Combined with main motor and gears.
5. Bottle transmitting system: Combined with air conveyor, steel starwheels and neck supporting carrier plates.
6. Electrical controlling system: this part is frequency inverted, PLC controlled and touch screen operated.

Company Profile


Complete Full Automatic Fresh Fruit Juice Processing Line Juice Filling MachineComplete Full Automatic Fresh Fruit Juice Processing Line Juice Filling Machine
Complete Full Automatic Fresh Fruit Juice Processing Line Juice Filling MachineComplete Full Automatic Fresh Fruit Juice Processing Line Juice Filling Machine

FAQ

Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.


Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.

Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.

Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed.Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.

Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.

Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units tosave international courier such as DHL, it is really costly.

Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.

Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
People who viewed this also viewed